Which one from the below options is correct logic sequence in case of Planning Strategy settings

Requirement Type - Strategy Group - Main Strategy - Material Master
Material Master - Main Strategy - Strategy Group - Requirement Type
Main Strategy - Strategy Group - Requirement Type - Material Master
Material Master - Strategy Group - Main Strategy - Requirement Type
Verified Answer
Correct Option - d