If you want to carry out processing inspection results for an inspection characteristic depending on the results of the immediate/previous required characteristic within the same operation,you should use ? (Select only one correct option )

Conditional Characteristic
Dependent Characteristic
Calculated Characteristic
Unplanned Characteristic
Correct Option - a